Our projects

Our company has an international presence, with highly qualified human capital and state-of-the-art infrastructure to guarantee the satisfaction of our clients.

TOLUCA PLANT

• Turnkey project.

• Installation of 2 production lines.

• Project and relocation of 3 production lines.

• Dismantling of production line with necessary conditioning to be transported to Europe.

LERMA PLANT

• Turnkey project.

• nstallation of 6 production lines.

• Engineering, logistics, transportation, removal, maneuvering, reinstallation and start-up of 14 production lines relocated from the Toluca plant to the Lerma plant, including electrical, mechanical, civil, hydraulic, pneumatic, electronic installation and software engineering for PLCs.

TOLUCA AND SALTILLO PLANT

• Removal of the primer oven to install the new one made of stainless steel, including injection ducts to the heating chambers.

• Booth installation.

• Design, manufacture and installation of freight elevators.

• Design, manufacture and installation of anti-explosion cabins for fuel dispatch on the production line.

• Modification of workstations.

• Manufacture of structures and platforms.

• Installation of transfer tables.

• Assembly of devices and equipment for PVC application in the FIAT 500 line.

• Installation of overhead conveyor line in PVC line.

• Retrofitting of cab for black light trucks.

• Retrofitting of the Ducato plant black light booth.

TOLUCA AND CUAUTITLAN PLANT

• Turnkey project.

• Total installation of the production plant in Cuautitlán Izcalli and Toluca, including electrical, mechanical, civil, hydraulic, pneumatic, electronic installation services and software engineering for PLC's.

PUEBLA PLANT

• Installation of ovens for the painting process, applying 100% TIG welding, made of stainless steel.

• Design, manufacture and installation of platforms and metal structures.

• Installation of service pipes in different diameters for the supply of air, water, oil, refrigerants and condensers.

MAGNA DECOPLAS

• Manufacturing design of a 700 m2 metal platform, to support the new furnace heating system, extractors and air-driven compressors; considering civil works for foundations, metal structure and metal floor; remaining at a floor height of 8 m.

AUGE INDUSTRIES

• Turnkey project.

 

• Installation of the warehouse 3 production plant in Lerma and Villa Hermosa, Tabasco. Including electrical, mechanical, civil, hydraulic, pneumatic, electronic installation services and software engineering for PLCs.

• Uninstallation and movements of production lines from the plants in Houston, Texas. Philadelphia and Hatfield, USA; reinstallation and commissioning of the same to the plant in Lerma, State of Mexico.

TRASMETAL SPA ITALIA

• Installation of a paint plant for Thissen Krup in San Miguel de Allende, Guanajuato; for the shock absorber line.

• Installation of a paint plant for ACPS Automotive México in Querétaro México.

• Currently, installation of a paint plant for Hisense Mexico, Monterrey.

CELAYA PLANT

• Design, manufacture and installation of security cells for production lines.

GERDAU CORSA

• Turnkey project.

• Design, installation and commissioning of a high security access control system for risk level 3, with hybrid technology.

• Design, installation and commissioning of radars for secure vehicle access control.

• Installation of automated perimeter lighting system that included 4 km. of fence.

• Installation and start-up of a radiation ion detection system on railways and trailer access.

VOLKSWAGEN

• Manufacture and installation of 3 sanding and extraction cabins.

• Manufacture and installation of 2 km. of cabin air injection ducts.

SALTILLO PLANT

• Design, manufacture and installation of security cells in production areas.

DETROIT DIESELMANUFACTURING

• Turnkey project for the installation and commissioning of the shaft line.

• Project, design and construction of general offices and warehouses.

TOLUCA PLANT

• Installation of equipment in production lines.

• Manufacture and installation of structures and production platforms.

•Automation of equipment and production machinery.

• Remodeling of offices, warehouses and production buildings.

GRUPO MODELO

• Design and installation of pumping system.

• Design and installation of upper storm drain system.

• Installation of glass walls at 30 meters. Tall.

• Manufacture of stainless steel railings.

• Repair of the metallic structure for the conservation of the

old property.

TOLUCA PLANT

• Support in installation and start-up of an automated 2-liter soda line.

WEG

• Turnkey project.

• Design, manufacture and installation and start-up of a wood heat treatment furnace to manufacture export packaging.

VALLEJO PLANT

• Disassembly of lines to be sent to Monterrey and to scrap.

• Manufacture of specific pharmaceutical grade furniture.

HUEHUETOCA PLANT

• Installation and start-up of a semblanteo cabin for a transformer.

SAN LUIS POTOSÍ PLANT

• Turnkey project.

• Engineering, design, manufacturing and installation of 2 fully automated boards for 2 shot blasting machines.

PLASTICS INJECTION PLANT

• Engineering, design, manufacturing and installation of an air treatment system, which integrates injection ducts, filtration systems, irrigation systems and an electrical control panel to maintain relative humidity and temperature conditions in the primer, base and paint booths. varnish.